Details
| Name: |
Deed for: Natural Gas Processor
|
| Data: |
A deed for a medium gas harvester installation.
|
| Complexity: |
21
|
| Required Tool: |
Structure and Furniture Crafting Tool and Structure and Furniture Crafting Station
|
| Schematic Data Size: |
10
|
| Granted XP: |
1900
|
| Practice XP: |
1995
|
| XP Type: |
Structure Crafting
|
| Crafting Tool Tab: |
Installation
|
| Item Category: |
Installation Deed
|
| Skill Required: |
Installations II: Medium Harvesters
|
|
Schematic
|
| Load-bearing Frame
|
| Steel |
200
|
|
|
| Body Shell and Casing
|
| Metal |
300
|
|
|
| Structure Foundation
|
| Low-Grade Ore |
150
|
|
|
| Bore Mechanism
|
| Metal |
100
|
|
|
| Gas Storage Tank
|
| Wall Module |
3 similar
|
|
|
| Boring Mechanism Buffers and Bushings
|
| Chemical |
200
|
|
|
| Power Supply Unit
|
| Generator Turbine |
1
|
|
|
| Gas Storage Unit
|
| Small Structure Storage Module |
1
|
|
|
| Resource Handling System
|
| Fluidic Drilling Pump Unit |
1
|
|
|
Related Tags
| 100%
|
This document is complete.
|
|
| Architect
|
This document is related to the Architect Profession.
|
|
| Schematic
|
This document relates to a schematic.
|
|
Experimental Properties
|
|
| Experimental Efficiency
|
| |
Extraction Rate
|
| |
|
Heat Resistance |
|
25%
|
| |
|
Shock Resistance |
|
25%
|
| |
|
Unit Toughness |
|
50%
|
| Experimental Storage
|
| |
Hopper Size
|
| |
|
Malleability |
|
33%
|
| |
|
Unit Toughness |
|
66%
|
|
|